![]() To prepare the Method statement of each activity.ģ. To review the updated HIRA and approve it.ġ. ![]() Any material to be required as per the Precautionary measures and proposed control measures need to arrangeĤ. To form a HIRA Cross-functional team along with Site In-charge/Engineer (Civil, Electrical, Mechanical), Safety In-charge, Fleet, HR/Admin, and subcontractor representative.ģ. Hazard Identification Risk Assessment and ControlĬLICK HERE FOR □ SWL AND SAFETY FACTOR HIRA ORGANISATION STRUCTURE FOR CONSTRUCTION SITE RESPONSIBILITIES OF HIRA TEAM S. MAJOR RISK: A risk that has the potential to result in a Major Accident classified as high risk to people, assets, the environment and/or company reputation as defined in TPL SHE Risk Matrix.ĬLICK HERE FOR □ ENVIRONMENT MANAGEMENT PLAN FOR CONSTRUCTION SITE The acronyms used in HIRA have the meaning defined below: E&I The chances of a hazard actually causing an injury or disease. PROBABILITY: The possibility of the event happening. ![]() The order is: Eliminate, Substitute, Isolate, Engineer, Administration, and PPE. HIERARCHY OF CONTROLS: Order of preference in the application of risk mitigations. Hazard is a potential condition awaiting to be converted into an accident if proper precautions are not taken into consideration. CONSEQUENCE: The unmitigated impact of the hazard in terms of People, Environment, Asset, and Reputation.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |